NEW MISSION HOUSE CLICK PICTURES TO ENLARGE
|
New Mission House Land Before Construction.
|
Backhoe cutting in the New Entrance (December 2007).
|
|
|
|
Excavation Begins (May 1, 2008).
|
Excavation Continues (May 2008).
|
|
|
|
Laying out the Foundation(May 22, 2008).
|
Building the footings for columns (June 5, 2008).
|
|
|
|
Building the Foundation(June 5, 2008).
|
The First Basement Wall Goes Up (June 12, 2008).
|
|
|
|
Workers Encounter Rocks in Excavation (June 12, 2008).
|
Rock is Quarried as used for Retaining Walls(June 12, 2008).
|
|
|
|
Basement Structure Takes Shape (July 11, 2008).
|
Retaining Wall for Patio is Started (July 31, 2008).
|
|
|
|
First Floor Structure Taking Shape (August 16, 2008).
|
Steel bar joists are set for first floor 8-30-08
|
|
|
|
Northeast corner of the building takes shape 9-05-08
|
Metal decking is ready for pouring of cement 9-05-08
|
|
|
|
Half of 1st floor concrete is done 9-19-08
|
Basement area begins to take shape
|
|
|
|
Columns being built in preparation for second floor 9-27-08
|
Forms for the archways being placed 9-27-08
|